Реконструкція каналізаційних очисних споруд смт. Цумань Ківерцівського району Волинської області
UAH6,448,015.20
including VATfrom Oct 22, 2018, 16:53
until Nov 7, 2018, 00:00
from Nov 7, 2018, 11:24
until Nov 7, 2018, 11:51
from Nov 7, 2018, 11:51
until Nov 12, 2018, 12:00
from Nov 12, 2018, 12:00
until Nov 29, 2018, 17:45
Pay attention!
00:00 - means the beginning of the day, not its end
Pay attention!
00:00 - means the beginning of the day, not its end
Pay attention!
00:00 - means the beginning of the day, not its end
Show all important dates
Hide dates
Information about customer
Main contact
Show customer contacts
Hide customer contacts
Items list
№ | Name | Quantity | Delivery | Place of delivery |
---|---|---|---|---|
1 |
Реконструкція каналізаційних очисних споруд смт. Цумань Ківерцівського району Волинської області
Code DK 021:2015:
45450000-6 Інші завершальні будівельні роботи
|
Quantity: 1 роботи |
Delivery period:
до Dec 31, 2019
|
Place of delivery: Україна, 45233, Волинська область, смт.Цумань, Чехова,2 |
Procurement documents
Document name | Document type | Date of publishing |
Procurement documents | Oct 22, 2018, 16:53 | |
Not indicated | Oct 22, 2018, 16:53 | |
Not indicated | Oct 22, 2018, 16:53 | |
Not indicated | Nov 7, 2018, 11:51 | |
Not indicated | Nov 7, 2018, 11:51 | |
|
||
Draft contract | Oct 22, 2018, 16:53 | |
Not indicated | Oct 22, 2018, 16:53 | |
Not indicated | Oct 22, 2018, 16:53 | |
Not indicated | Oct 22, 2018, 16:53 | |
Not indicated | Oct 22, 2018, 16:53 | |
Not indicated | Oct 22, 2018, 16:53 | |
Not indicated | Oct 22, 2018, 16:53 | |
Not indicated | Oct 22, 2018, 16:55 |
About tender
Show more information
Hide detailed information
Auction history
View
Participants of auction
Documents submitted with the offer
Document name | Document type | Date of publishing |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 9, 2018, 09:15 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Price offer | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 9, 2018, 09:17 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 9, 2018, 09:15 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 9, 2018, 09:15 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 9, 2018, 09:15 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Technical specifications | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 9, 2018, 09:16 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 9, 2018, 09:15 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 9, 2018, 09:15 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Technical specifications | Nov 6, 2018, 15:46 | |
Technical specifications | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Compliance confirmation | Nov 6, 2018, 15:46 | |
Documents confirming of qualification | Nov 6, 2018, 15:46 | |
Estimate | Nov 6, 2018, 15:46 | |
Not indicated | Nov 9, 2018, 09:19 | |
Not indicated | Nov 6, 2018, 15:49 | |
|
Decision of the responsible person
Document name | Document type | Date of publishing |
Extract from the register | Nov 7, 2018, 11:51 | |
Not indicated | Nov 9, 2018, 16:48 | |
Not indicated | Nov 9, 2018, 16:52 | |
Extract from the register | Nov 7, 2018, 11:51 |
Offer
Status
disqualified
Documents submitted with the offer
Document name | Document type | Date of publishing |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Estimate | Nov 14, 2018, 19:10 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 17, 2018, 14:52 | |
Estimate | Nov 14, 2018, 19:10 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Estimate | Nov 14, 2018, 19:10 | |
Documents confirming of qualification | Nov 24, 2018, 12:19 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 17, 2018, 11:38 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Estimate | Nov 17, 2018, 11:32 | |
Estimate | Nov 6, 2018, 21:54 | |
Estimate | Nov 14, 2018, 19:10 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Estimate | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 23, 2018, 08:14 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 17, 2018, 11:33 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Estimate | Nov 14, 2018, 19:10 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Estimate | Nov 14, 2018, 19:10 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Estimate | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Price offer | Nov 14, 2018, 19:10 | |
Estimate | Nov 6, 2018, 21:54 | |
Not indicated | Nov 24, 2018, 12:26 | |
Not indicated | Nov 23, 2018, 08:16 | |
Not indicated | Nov 6, 2018, 21:55 | |
|
||
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Price offer | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Estimate | Nov 14, 2018, 19:10 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Estimate | Nov 6, 2018, 21:54 | |
Documents confirming of qualification | Nov 6, 2018, 21:54 | |
Estimate | Nov 14, 2018, 19:10 |
Decision of the responsible person
Document name | Document type | Date of publishing |
Extract from the register | Nov 9, 2018, 16:52 | |
Not indicated | Nov 12, 2018, 12:00 | |
Not indicated | Nov 12, 2018, 11:56 |
Contract
Document name | Document type | Date of publishing |
Annexes to the contract | Nov 29, 2018, 17:40 | |
Annexes to the contract | Nov 29, 2018, 17:41 | |
Annexes to the contract | Nov 29, 2018, 17:40 | |
Signed contract | Nov 29, 2018, 17:40 | |
Annexes to the contract | Nov 29, 2018, 17:40 | |
Annexes to the contract | Nov 29, 2018, 17:40 | |
Not indicated | Nov 29, 2018, 17:44 | |
Annexes to the contract | Nov 29, 2018, 17:40 | |
Annexes to the contract | Nov 29, 2018, 17:40 |
Offer
Status
winner
Documents submitted with the offer
Document name | Document type | Date of publishing |
Documents confirming of qualification | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Technical specifications | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Documents confirming of qualification | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Technical specifications | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Price offer | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Not indicated | Nov 6, 2018, 21:52 | |
Estimate | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:50 | |
Documents confirming of qualification | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Technical specifications | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Documents confirming of qualification | Nov 6, 2018, 21:50 | |
Price offer | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Price offer | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Estimate | Nov 6, 2018, 21:49 | |
Price offer | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Compliance confirmation | Nov 6, 2018, 21:50 | |
Estimate | Nov 6, 2018, 21:49 | |
Compliance confirmation | Nov 6, 2018, 21:50 |
Offer
Status
Not consideredContract
View of the contract
Useful links
Public procurements list of the client Цуманське виробниче управління житлово-комунального господарстваYou may be interested
UAH6,898,974.00 including VAT
ViewUAH8,962,737.20 including VAT
ViewUAH5,462,602.80 including VAT
View