кабельно-провідникова продукція
кабельно-провідникова продукція
cable and wiring products
cable and wiring products
UAH12,418,924.68
including VATfrom Jul 3, 2020, 15:12
until Aug 4, 2020, 10:00
from Aug 4, 2020, 10:03
until Sep 2, 2020, 00:00
from Sep 2, 2020, 15:37
until Sep 2, 2020, 15:58
from Sep 2, 2020, 15:58
until Sep 3, 2020, 16:35
from Sep 3, 2020, 16:35
until Sep 18, 2020, 15:23
Pay attention!
00:00 - means the beginning of the day, not its end
Show all important dates
Hide dates
Information about customer
Main contact
Show customer contacts
Hide customer contacts
Items list
№ | Name | Quantity | Delivery | Place of delivery |
---|---|---|---|---|
1 |
Кабель сигнально-блокувальний СБВГ 12х0,9 Кабель сигнально-блокувальний СБВГ 12х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 181 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
2 |
Кабель сигнально-блокувальний СБВГ 12х2х0,9 Кабель сигнально-блокувальний СБВГ 12х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 300 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
3 |
Кабель сигнально-блокувальний СБВГ 3х0,9 Кабель сигнально-блокувальний СБВГ 3х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 182 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
4 |
Кабель сигнально-блокувальний СБВГ 7х2х0,9 Кабель сигнально-блокувальний СБВГ 7х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 200 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
5 |
Кабель магістральний МКПАБл 14х4х1,05+5х2х0,7+1х0,7 Кабель магістральний МКПАБл 14х4х1,05+5х2х0,7+1х0,7
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 130 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
6 |
Кабель магістральний МКПАБл 7х4х1,05+5х2х0,7+1х0,7 Кабель магістральний МКПАБл 7х4х1,05+5х2х0,7+1х0,7
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 801 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
7 |
Кабель магістральний МКПАШп 7х4х1,05+5х2х0,9+1x0,7 Кабель магістральний МКПАШп 7х4х1,05+5х2х0,9+1x0,7
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 721 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
8 |
Кабель магістральний МКСАШп 4х4х1,2 Кабель магістральний МКСАШп 4х4х1,2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 332 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
9 |
Кабель зонового зв`язку ЗКП 1х4х1,2 Кабель зонового зв`язку ЗКП 1х4х1,2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 772 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
10 |
Кабель місцевого зв`язку високочастотний КСПП 1х4х1,2 Кабель місцевого зв`язку високочастотний КСПП 1х4х1,2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 340 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
11 |
Кабель місцевого зв`язку високочастотний КСППЗ 1х4х1,2 Кабель місцевого зв`язку високочастотний КСППЗ 1х4х1,2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 232 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
12 |
Кабель телефонний ТЗАШп 7х4х1,2 Кабель телефонний ТЗАШп 7х4х1,2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 711 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
13 |
Кабель телефонний ТЗБл 7х4х1,2 Кабель телефонний ТЗБл 7х4х1,2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 260 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
14 |
Кабель телефонний ТЗБл 12х4х1,2 Кабель телефонний ТЗБл 12х4х1,2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 100 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
15 |
Кабель телефонний ТЗАБл 4х4х1,2 Кабель телефонний ТЗАБл 4х4х1,2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 170 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
16 |
Кабель телефонний ТЗАБл 4х4х0,9 Кабель телефонний ТЗАБл 4х4х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 160 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
17 |
Кабель телефонний ТЗАБл 7х4х0,9 Кабель телефонний ТЗАБл 7х4х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 151 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
18 |
Кабель телефонний ТЗАШп 7х4х0,9 Кабель телефонний ТЗАШп 7х4х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 560 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
19 |
Кабель телефонний ТППепЗ 30х2х0,5 Кабель телефонний ТППепЗ 30х2х0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 100 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
20 |
Кабель телефонний ТППепЗ 50х2х0,4 Кабель телефонний ТППепЗ 50х2х0,4
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 200 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
21 |
Кабель телефонний ТППеп 100х2х0,32 Кабель телефонний ТППеп 100х2х0,32
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 100 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
22 |
Кабель телефонний ТППеп 100х2х0,5 Кабель телефонний ТППеп 100х2х0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 640 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
23 |
Кабель телефонний ТППеп 10х2х0,32 Кабель телефонний ТППеп 10х2х0,32
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 50 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
24 |
Кабель телефонний ТППеп 10х2х0,4 Кабель телефонний ТППеп 10х2х0,4
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,532 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
25 |
Кабель телефонний ТППеп 10х2х0,5 Кабель телефонний ТППеп 10х2х0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,231 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
26 |
Кабель телефонний ТППеп 100х2х0,4 Кабель телефонний ТППеп 100х2х0,4
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 264 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
27 |
Кабель телефонний ТППеп 20х2х0,4 Кабель телефонний ТППеп 20х2х0,4
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,482 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
28 |
Кабель телефонний ТППеп 20х2х0,5 Кабель телефонний ТППеп 20х2х0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,051 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
29 |
Кабель телефонний ТППеп 30х2х0,4 Кабель телефонний ТППеп 30х2х0,4
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,160 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
30 |
Кабель телефонний ТППеп 30х2х0,5 Кабель телефонний ТППеп 30х2х0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 457 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
31 |
Кабель телефонний ТППеп 50х2х0,32 Кабель телефонний ТППеп 50х2х0,32
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 150 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
32 |
Кабель телефонний ТППеп 50х2х0,4 Кабель телефонний ТППеп 50х2х0,4
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 792 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
33 |
Кабель телефонний ТППеп 50х2х0,5 Кабель телефонний ТППеп 50х2х0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 621 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
34 |
Кабель телефонний ТППеп 5х2х0,5 Кабель телефонний ТППеп 5х2х0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 371 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
35 |
Провід (кабель однопарний) ПРППМ 2х0,9 Провід (кабель однопарний) ПРППМ 2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 2,661 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
36 |
Провід (кабель однопарний) ПРППМ 2х1,2 Провід (кабель однопарний) ПРППМ 2х1,2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 5,397 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
37 |
Провід телефонний ТРП 2х0,4 Провід телефонний ТРП 2х0,4
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 4,962 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
38 |
Провід кросовий ПКСВ 2х0,5 Провід кросовий ПКСВ 2х0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 7,912 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
39 |
Провід монтажний МГШВ-1,5 Провід монтажний МГШВ-1,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 12,842 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
40 |
Провід монтажний МГШВ-0,75 Провід монтажний МГШВ-0,75
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 80,771 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
41 |
Авіапровід БПВЛ 0,75мм2 Авіапровід БПВЛ 0,75мм2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 2,340 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
42 |
Авіапровід БПВЛ 1,0мм2 Авіапровід БПВЛ 1,0мм2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 10,800 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
43 |
Авіапровід БПВЛ 1,5мм2 Авіапровід БПВЛ 1,5мм2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 87,340 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
44 |
Авіапровід БПВЛ 2,5мм2 Авіапровід БПВЛ 2,5мм2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 80,230 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
45 |
Авіапровід БПВЛ 25,0мм2 Авіапровід БПВЛ 25,0мм2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,510 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
46 |
Авіапровід БПВЛ 4,0мм2 Авіапровід БПВЛ 4,0мм2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 2,110 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
47 |
Авіапровід БПВЛ 6,0мм2 Авіапровід БПВЛ 6,0мм2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 2,050 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
48 |
Авіапровід БПВЛ 16,0мм2 Авіапровід БПВЛ 16,0мм2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 2,110 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
49 |
Авіапровід БПВЛ 95,0мм2 Авіапровід БПВЛ 95,0мм2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 200 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
50 |
Кабель радіочастотний РК 50-7-11 Кабель радіочастотний РК 50-7-11
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,581 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
51 |
Кабель радіочастотний РК 75-4-11 Кабель радіочастотний РК 75-4-11
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 571 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
52 |
Кабель радіочастотний РК 75-4-15 Кабель радіочастотний РК 75-4-15
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 461 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
53 |
Кабель сигнально-блокувальний СБВГнг 7х0.9 Кабель сигнально-блокувальний СБВГнг 7х0.9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 300 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
54 |
Кабель сигнально-блокувальний СБзПу 3х0,9 Кабель сигнально-блокувальний СБЗПу 3х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 3,147 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
55 |
Кабель сигнально-блокувальний СБЗПу 4х0,9 Кабель сигнально-блокувальний СБЗПу 4х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 250 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
56 |
Кабель сигнально-блокувальний СБзПу 5х0,9 Кабель сигнально-блокувальний СБЗПу 5х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 6,658 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
57 |
Кабель сигнально-блокувальний СБзПу 7х0,9 Кабель сигнально-блокувальний СБЗПу 7х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 974 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
58 |
Кабель сигнально-блокувальний СБзПу 9х0,9 Кабель сигнально-блокувальний СБЗПу 9х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 938 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
59 |
Кабель сигнально-блокувальний СБзПу 12х0,9 Кабель сигнально-блокувальний СБЗПу 12х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 2,862 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
60 |
Кабель сигнально-блокувальний СБзПу 16х0,9 Кабель сигнально-блокувальний СБЗПу 16х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 62 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
61 |
Кабель сигнально-блокувальний СБзПу 19х0,9 Кабель сигнально-блокувальний СБЗПу 19х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 902 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
62 |
Кабель сигнально-блокувальний СБзПу 24х0,9 Кабель сигнально-блокувальний СБЗПу 24х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 850 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
63 |
Кабель сигнально-блокувальний СБзПу 27х0,9 Кабель сигнально-блокувальний СБЗПу 27х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 652 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
64 |
Кабель сигнально-блокувальний СБзПу 4х2х0,9 Кабель сигнально-блокувальний СБЗПу 4х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,882 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
65 |
Кабель сигнально-блокувальний СБзПу 7х2х0,9 Кабель сигнально-блокувальний СБЗПу 7х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 2,209 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
66 |
Кабель сигнально-блокувальний СБзПу 12х2х0,9 Кабель сигнально-блокувальний СБЗПу 12х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 634 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
67 |
Кабель сигнально-блокувальний СБзПу 14х2х0,9 Кабель сигнально-блокувальний СБЗПу 14х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,980 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
68 |
Кабель сигнально-блокувальний СБзПу 24х2х0,9 Кабель сигнально-блокувальний СБЗПу 24х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 3,269 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
69 |
Кабель сигнально-блокувальний СБзПу 27х2х0,9 Кабель сигнально-блокувальний СБЗПу 27х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 906 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
70 |
Кабель сигнально-блокувальний СБзПу 30х2х0,9 Кабель сигнально-блокувальний СБЗПу 30х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,383 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
71 |
Провід монтажний МГШВ-0,5 Провід монтажний МГШВ-0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,065 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
72 |
Провід кросовий ПКСВ 3х0,5 Провід кросовий ПКСВ 3х0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,500 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
73 |
Провід телефонний ТРП 2х0,5 Провід телефонний ТРП 2х0,5
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,311 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
74 |
Кабель телефонний ТППепЗ 20х2х0,4 Кабель телефонний ТППепЗ 20х2х0,4
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 711 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
75 |
Кабель телефонний ТППепЗ 30х2х0,4 Кабель телефонний ТППепЗ 30х2х0,4
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 221 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
76 |
Авіапровід БПВЛ 10,0мм2 Авіапровід БПВЛ 10,0мм2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,610 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
77 |
Провід польовий П-274 (П-274М) Провід польовий П-274 (П-274М)
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 26,650 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
78 |
Кабель сигнально-блокувальний СБВГнг 12х0,9 Кабель сигнально-блокувальний СБВГнг 12х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 111 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
79 |
Кабель КПВ-ВП 4х2х0,50 (КПВ-ВП (350) 4х2х0,50) (кабель UTP cat.5E) Кабель КПВ-ВП 4х2х0,50 (КПВ-ВП (350) 4х2х0,50) (кабель UTP cat.5E)
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 9,600 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
80 |
LAN-кабель UTP-cat.6 (4 пари) LAN-кабель UTP-cat.6 (4 пари)
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 900 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
81 |
Провід кросовий ПКСВ 2х0,4 Провід кросовий ПКСВ 2х0,4
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 5,950 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
82 |
Кабель радіочастотний РК 75-9-13 Кабель радіочастотний РК 75-9-13
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 50 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
83 |
Кабель сигнально-блокувальний СБВГнг 10х2х0,9 Кабель сигнально-блокувальний СБВГнг 10х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 250 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
84 |
Провід монтажний МГШВ-1,0 Провід монтажний МГШВ-1,0
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,250 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
85 |
Кабель магістральний МКПАБл 4х4х1,05+1х2х0,7+1х0,7 Кабель магістральний МКПАБл 4х4х1,05+1х2х0,7+1х0,7
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 91 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
86 |
Кабель сигнально-блокувальний СБзПУЭ 4х2х0,9 Кабель сигнально-блокувальний СБЗПуЭ 4х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 742 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
87 |
Кабель сигнально-блокувальний СБзПУЭ 10х2х0,9 Кабель сигнально-блокувальний СБЗПуЭ 10х2х0,9
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 792 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
88 |
Кабель КПВЭ-ВП (200) 4х2х0,51 (кабель FTP cat.5E) Кабель КПВЭ-ВП (200) 4х2х0,51 (кабель FTP cat.5E)
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,000 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
89 |
Кабель магістральний МКПАШп 4х4х1,2 Кабель магістральний МКПАШп 4х4х1,2
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 1,132 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
90 |
Кабель радіочастотний РК 50-2-16 Кабель радіочастотний РК 50-2-16
Code DK 021:2015:
44320000-9 Кабелі та супутня продукція
|
Quantity: 500 м |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
Procurement documents
Document name | Document type | Date of publishing |
Not indicated | Sep 2, 2020, 15:58 | |
Not indicated | Sep 2, 2020, 15:58 | |
|
||
Not indicated | Jul 24, 2020, 08:41 | |
Not indicated | Jul 3, 2020, 15:09 | |
|
||
Not indicated | Jul 3, 2020, 15:09 | |
Not indicated | Jul 24, 2020, 08:41 | |
Not indicated | Jul 24, 2020, 08:41 | |
Not indicated | Jul 3, 2020, 15:10 | |
|
Terms of payment
About tender
Show more information
Hide detailed information
Prequalification of participants
Qualification protocol generated Qualification protocol generated Aug 27, 2020
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | Aug 3, 2020, 19:45 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Documents confirming of qualification | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Compliance confirmation | Sep 11, 2020, 15:30 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Price offer | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Price offer | Aug 3, 2020, 20:03 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Not indicated | Sep 11, 2020, 15:32 | |
Not indicated | Aug 3, 2020, 20:11 | |
|
||
Compliance confirmation | Sep 11, 2020, 15:30 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Compliance confirmation | Sep 11, 2020, 15:31 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Compliance confirmation | Sep 11, 2020, 15:30 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Compliance confirmation | Sep 11, 2020, 15:30 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Compliance confirmation | Sep 11, 2020, 15:31 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Documents confirming of qualification | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Not indicated | Aug 3, 2020, 20:11 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Documents confirming of qualification | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 |
Protocol for access to trading
Document name | Document type | Date of publishing |
Extract from the register | Aug 4, 2020, 10:04 |
Status:
Allowed to participate
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | Aug 3, 2020, 21:34 | |
Documents confirming of qualification | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:34 | |
Technical specifications | Aug 3, 2020, 21:22 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:35 | |
Technical specifications | Aug 3, 2020, 21:23 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Technical specifications | Aug 3, 2020, 21:34 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Technical specifications | Aug 3, 2020, 21:25 | |
Technical specifications | Aug 3, 2020, 21:33 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Technical specifications | Aug 3, 2020, 21:32 | |
Technical specifications | Aug 3, 2020, 21:29 | |
Technical specifications | Aug 3, 2020, 21:27 | |
Technical specifications | Aug 3, 2020, 21:33 | |
Technical specifications | Aug 3, 2020, 21:22 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Technical specifications | Aug 3, 2020, 21:23 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:35 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Documents confirming of qualification | Aug 3, 2020, 21:38 | |
Technical specifications | Aug 3, 2020, 21:29 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Not indicated | Aug 4, 2020, 09:16 | |
Technical specifications | Aug 3, 2020, 21:24 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Not indicated | Aug 4, 2020, 09:16 | |
Technical specifications | Aug 3, 2020, 21:23 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Technical specifications | Aug 3, 2020, 21:35 | |
Technical specifications | Aug 3, 2020, 21:24 | |
Technical specifications | Aug 3, 2020, 21:24 | |
Technical specifications | Aug 3, 2020, 21:34 | |
Technical specifications | Aug 3, 2020, 21:25 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:24 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:29 | |
Technical specifications | Aug 3, 2020, 21:33 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Documents confirming of qualification | Aug 3, 2020, 21:38 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Technical specifications | Aug 3, 2020, 21:27 | |
Technical specifications | Aug 3, 2020, 21:27 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:35 | |
Technical specifications | Aug 3, 2020, 21:24 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:29 | |
Technical specifications | Aug 3, 2020, 21:32 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Technical specifications | Aug 3, 2020, 21:25 | |
Technical specifications | Aug 3, 2020, 21:28 | |
Price offer | Aug 3, 2020, 21:21 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:35 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:27 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:37 |
Protocol for access to trading
Document name | Document type | Date of publishing |
Extract from the register | Aug 4, 2020, 10:04 |
Status:
Allowed to participateAuction history
View
Participants of auction
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | Aug 3, 2020, 19:45 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Documents confirming of qualification | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Compliance confirmation | Sep 11, 2020, 15:30 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Price offer | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Price offer | Aug 3, 2020, 20:03 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Not indicated | Sep 11, 2020, 15:32 | |
Not indicated | Aug 3, 2020, 20:11 | |
|
||
Compliance confirmation | Sep 11, 2020, 15:30 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Compliance confirmation | Sep 11, 2020, 15:31 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Compliance confirmation | Sep 11, 2020, 15:30 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Compliance confirmation | Sep 11, 2020, 15:30 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:59 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Compliance confirmation | Sep 11, 2020, 15:31 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:54 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Documents confirming of qualification | Aug 3, 2020, 19:38 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:45 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 20:01 | |
Technical specifications | Aug 3, 2020, 19:44 | |
Documents confirming of qualification | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:53 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Not indicated | Aug 3, 2020, 20:11 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 19:49 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 20:00 | |
Technical specifications | Aug 3, 2020, 19:42 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Technical specifications | Aug 3, 2020, 19:57 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 19:58 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 | |
Documents confirming of qualification | Aug 3, 2020, 19:42 | |
Technical specifications | Aug 3, 2020, 19:47 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:56 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:52 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:46 | |
Documents confirming of qualification | Aug 3, 2020, 19:41 | |
Documents confirming of qualification | Aug 3, 2020, 19:40 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:43 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Documents confirming of qualification | Aug 3, 2020, 19:37 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 20:02 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Technical specifications | Aug 3, 2020, 19:51 | |
Technical specifications | Aug 3, 2020, 19:50 | |
Technical specifications | Aug 3, 2020, 19:48 | |
Technical specifications | Aug 3, 2020, 19:55 | |
Documents confirming of qualification | Aug 3, 2020, 19:39 |
Decision of the responsible person
Document name | Document type | Date of publishing |
Not indicated | Sep 3, 2020, 16:34 | |
Not indicated | Sep 3, 2020, 16:34 | |
Information on debt (receipt #1)
PDF version accepted in
personal account
|
Reference | Sep 3, 2020, 16:35 |
Extract from the register | Sep 2, 2020, 17:04 | |
Information on debt (receipt #2)
PDF version accepted in
personal account
|
Reference | Sep 4, 2020, 13:10 |
Contract
Document name | Document type | Date of publishing |
Signed contract | Sep 18, 2020, 15:22 | |
Not indicated | Sep 18, 2020, 15:23 |
Offer
Status
winner
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | Aug 3, 2020, 21:34 | |
Documents confirming of qualification | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:34 | |
Technical specifications | Aug 3, 2020, 21:22 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:35 | |
Technical specifications | Aug 3, 2020, 21:23 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Technical specifications | Aug 3, 2020, 21:34 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Technical specifications | Aug 3, 2020, 21:25 | |
Technical specifications | Aug 3, 2020, 21:33 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Technical specifications | Aug 3, 2020, 21:32 | |
Technical specifications | Aug 3, 2020, 21:29 | |
Technical specifications | Aug 3, 2020, 21:27 | |
Technical specifications | Aug 3, 2020, 21:33 | |
Technical specifications | Aug 3, 2020, 21:22 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Technical specifications | Aug 3, 2020, 21:23 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:35 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Documents confirming of qualification | Aug 3, 2020, 21:38 | |
Technical specifications | Aug 3, 2020, 21:29 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Not indicated | Aug 4, 2020, 09:16 | |
Technical specifications | Aug 3, 2020, 21:24 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Not indicated | Aug 4, 2020, 09:16 | |
Technical specifications | Aug 3, 2020, 21:23 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Technical specifications | Aug 3, 2020, 21:35 | |
Technical specifications | Aug 3, 2020, 21:24 | |
Technical specifications | Aug 3, 2020, 21:24 | |
Technical specifications | Aug 3, 2020, 21:34 | |
Technical specifications | Aug 3, 2020, 21:25 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:24 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Technical specifications | Aug 3, 2020, 21:30 | |
Technical specifications | Aug 3, 2020, 21:29 | |
Technical specifications | Aug 3, 2020, 21:33 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Documents confirming of qualification | Aug 3, 2020, 21:38 | |
Technical specifications | Aug 3, 2020, 21:26 | |
Technical specifications | Aug 3, 2020, 21:27 | |
Technical specifications | Aug 3, 2020, 21:27 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:35 | |
Technical specifications | Aug 3, 2020, 21:24 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:29 | |
Technical specifications | Aug 3, 2020, 21:32 | |
Technical specifications | Aug 3, 2020, 21:36 | |
Technical specifications | Aug 3, 2020, 21:25 | |
Technical specifications | Aug 3, 2020, 21:28 | |
Price offer | Aug 3, 2020, 21:21 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:35 | |
Technical specifications | Aug 3, 2020, 21:31 | |
Technical specifications | Aug 3, 2020, 21:27 | |
Technical specifications | Aug 3, 2020, 21:37 | |
Technical specifications | Aug 3, 2020, 21:37 |
Offer
Status
Not consideredContract
View of the contract
Useful links
Public procurements list of the client ФІЛІЯ "ЦЕНТР ЗАБЕЗПЕЧЕННЯ ВИРОБНИЦТВА" АКЦІОНЕРНОГО ТОВАРИСТВА "УКРАЇНСЬКА ЗАЛІЗНИЦЯ"You may be interested
UAH16,373,200.00 without VAT
ViewUAH8,724,705.66 without VAT
View