«ДК 021:2015-09310000-5 «Електрична енергія» (Електрична енергія)
Тендерні пропозиції повинні готуватися українською мовою.
UAH786,076.17
including VATfrom Aug 10, 2020, 18:39
until Aug 28, 2020, 16:55
from Aug 31, 2020, 13:08
until Aug 31, 2020, 14:17
from Aug 31, 2020, 14:17
until Sep 9, 2020, 17:11
from Sep 9, 2020, 17:11
until Sep 22, 2020, 09:51
Pay attention!
00:00 - means the beginning of the day, not its end
Show all important dates
Hide dates
Information about customer
Main contact
Show customer contacts
Hide customer contacts
Items list
№ | Name | Quantity | Delivery | Place of delivery |
---|---|---|---|---|
1 |
Електрична енергія
Code DK 021:2015:
09310000-5 Електрична енергія
|
Quantity: 330,000 кіловат-година |
Delivery period:
до Dec 31, 2020
|
Place of delivery: Україна, Відповідно до документації |
Procurement documents
Document name | Document type | Date of publishing |
Procurement documents | Aug 20, 2020, 16:59 | |
Not indicated | Aug 31, 2020, 14:17 | |
Not indicated | Aug 31, 2020, 14:17 | |
|
||
Not indicated | Aug 20, 2020, 17:02 | |
Not indicated | Aug 10, 2020, 18:39 | |
|
||
Procurement documents | Aug 20, 2020, 16:58 | |
Procurement documents | Aug 10, 2020, 18:39 | |
|
Terms of payment
About tender
Show more information
Hide detailed information
Auction history
View
Participants of auction
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Not indicated | Aug 28, 2020, 16:54 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:51 | |
Technical specifications | Aug 28, 2020, 16:50 | |
Technical specifications | Aug 28, 2020, 16:51 |
Decision of the responsible person
Document name | Document type | Date of publishing |
Extract from the register | Sep 8, 2020, 09:58 | |
Review Protocol | Sep 8, 2020, 09:59 | |
Not indicated | Sep 8, 2020, 10:02 |
Offer
Status
disqualified
Documents submitted with the offer
Document name | Document type | Date of publishing |
Price offer | Aug 28, 2020, 08:56 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
|
||
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 26, 2020, 14:24 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
|
||
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Sep 14, 2020, 11:28 | |
Not indicated | Sep 14, 2020, 11:28 | |
Not indicated | Sep 14, 2020, 10:30 | |
Not indicated | Aug 28, 2020, 08:56 | |
Not indicated | Aug 26, 2020, 14:26 | |
Not indicated | Aug 18, 2020, 12:24 | |
|
||
Compliance confirmation | Aug 18, 2020, 12:23 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Sep 14, 2020, 10:29 | |
Compliance confirmation | Aug 18, 2020, 12:23 |
Decision of the responsible person
Document name | Document type | Date of publishing |
Extract from the register | Sep 8, 2020, 10:03 | |
Information on debt (receipt #1)
PDF version accepted in
personal account
|
Reference | Sep 9, 2020, 17:11 |
Review Protocol | Sep 9, 2020, 17:10 | |
Information on debt (receipt #2)
PDF version accepted in
personal account
|
Reference | Sep 10, 2020, 09:00 |
Not indicated | Sep 9, 2020, 17:11 |
Contract
Document name | Document type | Date of publishing |
Not indicated | Sep 22, 2020, 09:51 | |
Signed contract | Sep 22, 2020, 09:49 |
Offer
Status
winner
Documents submitted with the offer
Document name | Document type | Date of publishing |
Documents confirming of qualification | Aug 12, 2020, 15:47 | |
Price offer | Aug 12, 2020, 15:47 | |
Documents confirming of qualification | Aug 12, 2020, 15:47 | |
Technical specifications | Aug 12, 2020, 15:47 | |
Documents confirming of qualification | Aug 12, 2020, 15:47 | |
Documents confirming of qualification | Aug 12, 2020, 15:47 | |
Technical specifications | Aug 12, 2020, 15:47 | |
Technical specifications | Aug 12, 2020, 15:47 | |
Compliance confirmation | Aug 12, 2020, 15:47 | |
Documents confirming of qualification | Aug 12, 2020, 15:47 | |
Not indicated | Aug 12, 2020, 15:49 | |
Documents confirming of qualification | Aug 12, 2020, 15:47 | |
Documents confirming of qualification | Aug 12, 2020, 15:47 | |
Technical specifications | Aug 12, 2020, 15:47 | |
Compliance confirmation | Aug 12, 2020, 15:47 | |
Technical specifications | Aug 12, 2020, 15:47 | |
Compliance confirmation | Aug 12, 2020, 15:47 |
Offer
Status
Not considered
Documents submitted with the offer
Document name | Document type | Date of publishing |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Documents confirming of qualification | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Technical specifications | Aug 28, 2020, 14:31 | |
Documents confirming of qualification | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Documents confirming of qualification | Aug 28, 2020, 14:31 | |
Documents confirming of qualification | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 | |
Estimate | Aug 28, 2020, 14:31 | |
Compliance confirmation | Aug 28, 2020, 14:31 |
Offer
Status
Not considered
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Price offer | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Not indicated | Aug 21, 2020, 14:53 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 | |
Technical specifications | Aug 21, 2020, 14:14 |
Offer
Status
Not considered
Documents submitted with the offer
Document name | Document type | Date of publishing |
Documents confirming of qualification | Aug 28, 2020, 14:20 | |
Documents confirming of qualification | Aug 28, 2020, 14:21 | |
Documents confirming of qualification | Aug 28, 2020, 14:21 | |
Documents confirming of qualification | Aug 28, 2020, 14:20 | |
Documents confirming of qualification | Aug 28, 2020, 14:21 | |
Documents confirming of qualification | Aug 28, 2020, 14:20 | |
Not indicated | Aug 28, 2020, 14:28 | |
Documents confirming of qualification | Aug 28, 2020, 14:21 | |
Documents confirming of qualification | Aug 28, 2020, 14:21 | |
Price offer | Aug 28, 2020, 14:20 | |
Documents confirming of qualification | Aug 28, 2020, 14:20 | |
Documents confirming of qualification | Aug 28, 2020, 14:21 | |
Technical specifications | Aug 28, 2020, 14:20 | |
Documents confirming of qualification | Aug 28, 2020, 14:20 | |
Technical specifications | Aug 28, 2020, 14:21 | |
Documents confirming of qualification | Aug 28, 2020, 14:21 | |
Documents confirming of qualification | Aug 28, 2020, 14:20 | |
Documents confirming of qualification | Aug 28, 2020, 14:20 | |
Documents confirming of qualification | Aug 28, 2020, 14:20 | |
Documents confirming of qualification | Aug 28, 2020, 14:21 | |
Documents confirming of qualification | Aug 28, 2020, 14:21 | |
Documents confirming of qualification | Aug 28, 2020, 14:20 | |
Documents confirming of qualification | Aug 28, 2020, 14:20 | |
Compliance confirmation | Aug 28, 2020, 14:20 |
Offer
Status
Not considered
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Not indicated | Aug 28, 2020, 12:40 | |
Not indicated | Aug 28, 2020, 12:39 | |
|
||
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 | |
Technical specifications | Aug 28, 2020, 12:39 |
Offer
Status
Not considered
Documents submitted with the offer
Document name | Document type | Date of publishing |
Documents confirming of qualification | Aug 27, 2020, 00:23 | |
Technical specifications | Aug 27, 2020, 00:23 | |
Technical specifications | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:23 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Technical specifications | Aug 27, 2020, 00:23 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Technical specifications | Aug 27, 2020, 00:24 | |
Technical specifications | Aug 27, 2020, 00:23 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:23 | |
Technical specifications | Aug 27, 2020, 00:23 | |
Technical specifications | Aug 27, 2020, 00:23 | |
Documents confirming of qualification | Aug 27, 2020, 00:23 | |
Price offer | Aug 26, 2020, 22:24 | |
Technical specifications | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:23 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:24 | |
Technical specifications | Aug 27, 2020, 00:23 | |
Not indicated | Aug 27, 2020, 00:29 | |
Documents confirming of qualification | Aug 27, 2020, 00:26 | |
Technical specifications | Aug 27, 2020, 00:24 | |
Technical specifications | Aug 27, 2020, 00:24 | |
Documents confirming of qualification | Aug 27, 2020, 00:23 | |
Technical specifications | Aug 27, 2020, 00:23 | |
Technical specifications | Aug 27, 2020, 00:24 |
Offer
Status
Not considered
Documents submitted with the offer
Document name | Document type | Date of publishing |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Price offer | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Not indicated | Aug 26, 2020, 10:41 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Technical specifications | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Technical specifications | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:36 | |
Compliance confirmation | Aug 26, 2020, 10:35 | |
Compliance confirmation | Aug 26, 2020, 10:36 |
Offer
Status
Not considered
Documents submitted with the offer
Document name | Document type | Date of publishing |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Not indicated | Aug 28, 2020, 10:36 | |
Not indicated | Aug 28, 2020, 10:36 | |
|
||
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 | |
Compliance confirmation | Aug 28, 2020, 09:16 |
Offer
Status
Not consideredContract
View of the contract
Useful links
Public procurements list of the client КОМУНАЛЬНЕ ПІДПРИЄМСТВО "ВОЛИНСЬКА ОБЛАСНА ПСИХІАТРИЧНА ЛІКАРНЯ М.ЛУЦЬКА" ВОЛИНСЬКОЇ ОБЛАСНОЇ РАДИYou may be interested
UAH686,280.00 including VAT
ViewUAH900,000.00 including VAT
ViewUAH936,772.56 including VAT
View